tspangler72
New
- Messages
- 2
- Best answers
- 0
Hello, I have an MD that wants to bill for each polyp removed. Any advice on how to bill for the below scenario?
A. TWO -- 4 mm polyps in the cecum; sessile morphology; cold snare polypectomy performed, polyps retrieved.
B. TWO -- 2 mm polyps in the cecum; sessile morphology; cold forceps polypectomy performed, polyps retrieved.
C. 5 mm polyp in the sigmoid colon; sessile morphology; cold snare polypectomy performed, polyp retrieved.
D. 2 mm polyp in the sigmoid colon; sessile morphology; cold forceps polypectomy performed, polyp retrieved.
Thanks
A. TWO -- 4 mm polyps in the cecum; sessile morphology; cold snare polypectomy performed, polyps retrieved.
B. TWO -- 2 mm polyps in the cecum; sessile morphology; cold forceps polypectomy performed, polyps retrieved.
C. 5 mm polyp in the sigmoid colon; sessile morphology; cold snare polypectomy performed, polyp retrieved.
D. 2 mm polyp in the sigmoid colon; sessile morphology; cold forceps polypectomy performed, polyp retrieved.
Thanks