tonplair@gmail.com
Networker
If a patient has a Pump disconnect (96523) and a Reconnect (96416) on the same day, can we charge both codes, using a 59 modifier on the reconnect.
Usually, this is done on separate days but we have a patient that this is being done on the same day.
Thanks!
Usually, this is done on separate days but we have a patient that this is being done on the same day.
Thanks!