TWilliam2019
Guru
if a physician did a consult on the 7th and noted that likely a cath would be necessary at some point. the on the 11th he is rounding and the patient needs a cath and patient agrees can you bill the e/m and the cath for the 7th since it wasn't planned until he saw the pt that day? thanks