kimberliterpstra
Networker
- Messages
- 39
- Best answers
- 0
The patient was scheduled 1/22/24 for a screening colonoscopy. The scope was advanced to the cecum, but the surgeon states this was "incomplete screening colonoscopy due to poor prep." The patient is already re-scheduled for another colonoscopy with a two-day prep on 2/5/24.
Do I code the 1/22/24 colonoscopy as screening and the 2/5/24 colonoscopy as diagnostic? I don't think I should use a modifier for the 1/22/24 procedure, because the surgeon reached the cecum, even though the surgeon states it was "incomplete"... he was not able to visualize any details because there was too much liquid stool due to poor prep.
I'm thinking the payor is not going to reimburse for two screening colonoscopies...
Do I code the 1/22/24 colonoscopy as screening and the 2/5/24 colonoscopy as diagnostic? I don't think I should use a modifier for the 1/22/24 procedure, because the surgeon reached the cecum, even though the surgeon states it was "incomplete"... he was not able to visualize any details because there was too much liquid stool due to poor prep.
I'm thinking the payor is not going to reimburse for two screening colonoscopies...