- Messages
- 3
- Best answers
- 0
If hydration is started on a patient early in the day and then either later that day or the next an IVP is performed, would the hydration remain primary or would it be changed to have the IVP primary, even though the hydration was done much earlier in the timeline? And if you add IV's or chemo IVs to the mix, how does that fit in? Do you code timeline based or soley on the book rules for coding? Are there any exceptions?