Wondering if should use modifier 52 (ASC) , pt came in for hardware removal, physician was able to remove 2/3 of the screw when broke and the remainder imbedded, physican chose to leave the remainder of the scre due to felt would require extensive destruction elected to leave the rest of the screw in should I bill 20860-52?