rdavies
Contributor
I have a patient that had a X-ray confirmed broken arm. Provider selected an E & M and fracture care code. The fracture care code has a 90 day global. He told the patient to come back in 5 days for a recheck. At the recheck visit the arm was not healing right. The provider selected an E&M with mod 24/57. (decision for surgery) Is the recheck part of the global package?l