Hi
The professional side of the cci files states that 23700 has a subscript of "0" and cannot be billed with 29826.
The facility side of cci files states that 23700 has a subscript of "1" and can be billed.
I am confused. Should the billing on the UB for 23700 have no charges ($0.00) and I should bill it because it was done? Or should I bill the 23700 with charges? ($2,300.00) and hope it doesn't get denied?
thanks
The professional side of the cci files states that 23700 has a subscript of "0" and cannot be billed with 29826.
The facility side of cci files states that 23700 has a subscript of "1" and can be billed.
I am confused. Should the billing on the UB for 23700 have no charges ($0.00) and I should bill it because it was done? Or should I bill the 23700 with charges? ($2,300.00) and hope it doesn't get denied?
thanks